Click to Home
EmailPrint


Go To Search
Road Improvements
Road Improvements
Street improvements are performed by either applying a chip seal overcoat or by laying down RAP (recycled asphalt pavement) or completely reconstructing the road base material and asphalt overlay.  The 2009 tax notes are currently funding these projects.  For more information about road maintenance and improvements, download a copy of the Rockdale Street Maintenance Guide.

Texas Department of Transportation Highway Improvement Projects in the area

The following projects have been approved by the Texas Department of Transportation:

2013
  • County Road 284 at Donahoe Creek--replace existing bridge
  • FM 1712 from US 77 to FM 487-seal coat
  • US 190 from the Bell County line to 1.7 miles west of FM 486-rehabilitate existing road
  • US 190 from 1.7 miles west of FM 486 to the north city limits of Cameron-rehabilitate existing road
  • County road 355 (local road 428) at San Gabriel-replace existing bridge

2014
  • FM 2269 from FM 485 to 0.3 mile north of US 190-safety work: pavement widening
  • FM 486 4.0 miles southwest of US 190 to 2.1 miles northeast of FM 487-seal coat
  • FM 437 from the Bell County line to FM 487-seal coat
  • US 190 from US 77 south of Cameron to US 79-seal coat alternate
  • FM 485 from FM 979 to Harls Creek-seal coat-alternate
  • FM 485 from Harls Creek to the Robertson County line-seal coat-alternate

2015
  • FM 486 from County Road 412 to San Gabriel-seal coat
  • FM 486 from Turkey Creek to US 79-seal coat
  • FM 487 from County Road 402 to 1.0 mile north of County Road 435-safety work: pavement widening
2016
  • US 190 from US 77 to US 79-rehabilitate existing road
  • US 79 from 1.0 mile west of US 190to US 77-seal coat
  • US 79 from US 190 (north) to 1.0 mile west of US 190-seal coat
  • FM 2095 from FM 3242 to 0.6 mile north of US 79 in Gause-restore existing road
  • County Road 398 (local county road 440) at Brushy Creek-replace existing bridge